Real samples. Names and locations protected. Each report is different because every home is different. What doesn’t change is the rigor, and what the buyer or architect receives.
The sidewalk level is below the interior floor of the villa. To enter from the parking area you have to climb a significant step. The plans show no ramp.
It’s the difference between a home you walk into and one where grandparents trip on Christmas, where a stroller doesn’t go up easily, where suitcases are an effort, and where a person with a recovering knee can’t enter alone.
Resolve the level difference with a gentle ramp on the entry path, about a 4-meter slope. In a project that hasn’t broken ground, it’s one more line on the garden plan.
The house has two floors. The only way up is the staircase. The plans show no reserved space to install a small home elevator in the future, nor a slab prepared to open a shaft.
In ten or fifteen years: a hip operation, parents who become elderly, or you yourself carrying heavy things upstairs. Without provision in plans, installing it later means breaking slabs and moving electrical installations.
Reserve roughly 1.10 m × 1.50 m aligned between ground and upper floor, leaving the slab prepared and a planned electrical conduit. The elevator is not installed now, only ready for it.
The full report includes 8 detailed findings, GO/NO-GO checklist, and next steps. Upload your home’s plans. Delivery in up to 12 hours.
Addendum to sheet A100, redefine one space as ILS space, expanding the module to 3.70 m with adjacent 1.50 m transfer strip.
The proposed parking has two vehicle spaces of typical width approx. 2.70 m. No space is identified with accessible transfer dimensions.
Accessible space: minimum width 3.70 m with lateral transfer zone of 1.50 m; firm, non-slip surface, level with the pedestrian entry route.
Addendum to sheet A100, redefine one space as ILS space, expanding the module to 3.70 m with adjacent 1.50 m transfer strip.
3.70 m × 5.00 m space + 1.50 m lateral transfer.
The Door Schedule specifies five P2-type doors, single-leaf swing, 0.80 m × 2.20 m leaf. After deducting the frame, the resulting clear passage is estimated at 0.75 m, below the ILS minimum.
Addendum to Door Schedule, replace the five P2 units with 0.95 m leaf, achieving clear passage ≥0.90 m.
0.95 m × 2.20 m leaf → effective clear passage ≥0.90 m.
The full report includes 15 technical findings, discipline-specific roadmap, and GO/NO-GO checklist. For architects and technical teams. Delivery in 3 to 5 business days.